I've got a job to look at, I've already got my foot in the door as I've done there two bathrooms previously.
It's downstairs kitchen and dining area, open plan, 53m, new concrete screed which is dry. 60x60 tiles which I haven't seen yet.
Thinking of £30 a Meter with materials. will probably get 3m out of a bag I would thing.
I've also been told the screed is very dusty and will need a lot of priming, sounds a little strange. It's pumped over wet ufh I think.