H
huffy
Hi guys,
firstly i want to apologise for the length this question is going to be, and secondly thank you for the great help and advise i found on here whilst laying and tiling over my underfloor heating. (i will add all the photos to the projects when the kitchen is complete)
so far i have got the underfloor heating down, tiled the floor and now have most of the kitchen in, bar a few appliance doors (where i am waiting on drilling templates)
anyway, i will be starting to tile the splashbacks, which i will be 2 work surfaces at 3M long and about .5M high, with one window which will need tiling part way up the reveal. there are a couple of sockets on the second work surface. the kitchen is in an 'L' shape if it makes it a bit clearer. anyway i have a rake of question and queries which i would greatly appreiciate you help with.
here goes.
1. the work surfaces are nice and level, so am i ok going straight off them, or would you still batton / spirit level?
2. is it best to run sealant along the edge of the worktop (where it meets the wall) before and after i tile or will tiling and sealant afterwards be ok?
3. any advise on adhesive and grout would be appreciated, the tiles are white so i'll be using white grout. the wall is new plaster (dried for 6 weeks now) so will i need to seal it (i guess that depends on the adhesive)
4. would the adhesive need to be heat resistant as the tiles will run behind the hob?
5. and starting points? one worktop has the window as the main feature, so will the centre line of this be the starting point?, and likewise for the hob and extractor chimney on the other wall?
6. do you all use the trims around window reveals and edges, or do you just use sealant to create the finished edge?
REALLY SORRY for all the questions, i found the floor a challenge due to the shape of the room but am over the moon with the results and it is largley down to the help and advise found on here, keep up the good work guys 🙂 🙂 🙂
cheers Huffy
firstly i want to apologise for the length this question is going to be, and secondly thank you for the great help and advise i found on here whilst laying and tiling over my underfloor heating. (i will add all the photos to the projects when the kitchen is complete)
so far i have got the underfloor heating down, tiled the floor and now have most of the kitchen in, bar a few appliance doors (where i am waiting on drilling templates)
anyway, i will be starting to tile the splashbacks, which i will be 2 work surfaces at 3M long and about .5M high, with one window which will need tiling part way up the reveal. there are a couple of sockets on the second work surface. the kitchen is in an 'L' shape if it makes it a bit clearer. anyway i have a rake of question and queries which i would greatly appreiciate you help with.
here goes.
1. the work surfaces are nice and level, so am i ok going straight off them, or would you still batton / spirit level?
2. is it best to run sealant along the edge of the worktop (where it meets the wall) before and after i tile or will tiling and sealant afterwards be ok?
3. any advise on adhesive and grout would be appreciated, the tiles are white so i'll be using white grout. the wall is new plaster (dried for 6 weeks now) so will i need to seal it (i guess that depends on the adhesive)
4. would the adhesive need to be heat resistant as the tiles will run behind the hob?
5. and starting points? one worktop has the window as the main feature, so will the centre line of this be the starting point?, and likewise for the hob and extractor chimney on the other wall?
6. do you all use the trims around window reveals and edges, or do you just use sealant to create the finished edge?
REALLY SORRY for all the questions, i found the floor a challenge due to the shape of the room but am over the moon with the results and it is largley down to the help and advise found on here, keep up the good work guys 🙂 🙂 🙂
cheers Huffy