Your list seems good as long as you follow each stage to the installation instructions all the way through the project. It is vital to get a solid bed of adhesive under the cement boards and the tiles, you shouldnt ever "dot and dab" anything apart from plasterboard on walls (that I can think of). This shouldnt be hard with your floor, trowel the adhesive on the floor and press the boards down into it firmly and give them a bit of a twist making sure that the corners and edges are well and truly bedded down into the adhesive, then the screws do a good job of pulling the boards down into the adhesive bed.