time it takes for plaster skim to cure before tiling

UK Tiling Forum; Established 2006

Welcome to the UK Tiling Forum by TilersForums.com, built in 2006 by Tilers, run by Tilers.

View all of the UK tiling forum threads, questions and discussions here.

Tilers Forums Official Sponsors

Thanks for all contributers.
The area i'm talking about is 1/2 square metre, with 10 x 8 inch tiles. its a repair rather than a full wall, should i still wait a month?????

If you dont want to repair it again then id wait!
 
Thanks for all contributers.
The area i'm talking about is 1/2 square metre, with 10 x 8 inch tiles. its a repair rather than a full wall, should i still wait a month?????


as i said 15 days and your good to go
 
Thanks for all contributers.
The area i'm talking about is 1/2 square metre, with 10 x 8 inch tiles. its a repair rather than a full wall, should i still wait a month?????


no mate but i would still give it 2 weeks :thumbsup:
ed
 
hi little

just read the depth of which you are patching...

right, heres some advice you should take note of.......
if you are putting on 15mm of bonding/hardwall, then because its designed to be applied by the book at 11mm and you are putting on 15mm
i would do a scratch coat of around 8mm, allow it to pick up (firm up and change to a darker colour approx 1 to 1 and a half hours and then put the 2nd 7mm coat on, then leave it to set a bit longer than normal (around 4-5 hours and then skim..

if you put too much on in one hit, it will shrink and crack!! so build up the layers and control the drying/setting/suction time...

any probs just fire away with the questions :thumbsup:
ed
 
hi little

just read the depth of which you are patching...

right, heres some advice you should take note of.......
if you are putting on 15mm of bonding/hardwall, then because its designed to be applied by the book at 11mm and you are putting on 15mm
i would do a scratch coat of around 8mm, allow it to pick up (firm up and change to a darker colour approx 1 to 1 and a half hours and then put the 2nd 7mm coat on, then leave it to set a bit longer than normal (around 4-5 hours and then skim..

if you put too much on in one hit, it will shrink and crack!! so build up the layers and control the drying/setting/suction time...

any probs just fire away with the questions :thumbsup:
ed

Very true but use hardwall rather than bonding dry alot quicker :thumbsup:
 
Very true but use hardwall rather than bonding dry alot quicker :thumbsup:

i get your point but the background denotes whether to use bonding or hardwall not the drying time because over 2 weeks it really wont come into play..

hardwall for high suction backgrounds
bonding for low suction backgrounds......
both are around the same setting time. the substrate will determine what speeds up the suction which in turn speeds up the setting time so its important to get the right product for the right surface!!

if i were you little, just apply some water to the wall with a brush, if it soaks in immediately or to hear a sucking noise then go for the hardwall, if the water just runs down the wall and the wall is not very porous , then go for the bonding. that will solve it for you :thumbsup:
ed

ed
 
Why not use some 9.5mm plasterboard with a fair bit of adhesive behind, that should speed the job along
 
is this true? when I tiled a kitchen wall with someone before he had the plasterer in and then tiled next day?
 
is this true? when I tiled a kitchen wall with someone before he had the plasterer in and then tiled next day?

yea and so do diy sos..wonder if they do a "revisited" program..see if tiles are still on wall !
 

Advertisement

Thread Information

Title
time it takes for plaster skim to cure before tiling
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
19

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
Little5,
Last reply from
ian158,
Replies
19
Views
12,129

Thread statistics

Created
Little5,
Last reply from
ian158,
Replies
19
Views
12,129
Back