U
Unregistered
Hi hope you can advise I have installed a shower over the bath and have the two channels that the pipes sit in open. I want to start tiling in the morning so can I tile over these with the tiles 25 x 33 set so the channel is central or do I need to plaster them up. I have heard I will have to wait 4 weeks if I plaster up.
Thanks
Mike
Thanks
Mike