L Leatherface Feb 27, 2007 #1 As mentioned in slate topic Attachments 2007_01170224.JPG 67.5 KB · Views: 158
L Leatherface Feb 28, 2007 #4 A couple of hours, twice. 6 hours between coats, then 24 hours before grouting Attachments 2007_01170226.JPG 77.8 KB · Views: 64
Dan Admin Staff member Mar 1, 2007 #5 The tile isn't my cup of tea but the job is done well. Nice one. 🙂 Never been much for rustic slate. Seems to be the scraps of the good stuff or something to me LOL.
The tile isn't my cup of tea but the job is done well. Nice one. 🙂 Never been much for rustic slate. Seems to be the scraps of the good stuff or something to me LOL.
L Leatherface Mar 1, 2007 #6 Each to their own I personally like it. but hey if we all liked the same it would be boring. Cheers
C CON5933 Mar 1, 2007 #7 A very nice job there mate. Curiosity, given the prep work and sealing etc, what would a job like that pay in your neck of the woods.
A very nice job there mate. Curiosity, given the prep work and sealing etc, what would a job like that pay in your neck of the woods.
L Leatherface Mar 1, 2007 #8 £45 per square mettre - in this case it was cash - job was on recommendation.