Search the forum,

Discuss Skirting tiles & fitting uncoupling membrane in the Australia Tiling Forum area at TilersForums.com.

O

Old Mod

Sounds full on! 10mins for 1.2m!
130m2 to scrape,clean, sweep and maybe prime, that's not an hours work I know!
8m2 ish is probably one mix, if ur using rapid, sorry if I was using rapid I would want my bucket washed completely clean between mixes. (Otherwise shorter lot life time next mix)
Then the Ditra has to be rolled out cut and trimmed in possibly (if its multi room that's a fair bit of trimming) then tamped or rolled into the adhesive air extracted.
Are the joints taped? That's not a five min job if done correctly with Kerdi Coll.
I'm assuming @Dan that calculation applies to the whole day without any kind of break?
Not saying it can't be done obviously, I can't, its just an observation.
I also tend to use any little extra I make on installing Ditra for those silly hidden extras haha
Not disputing any of the above advice at all!
Just running the job past myself, out loud!:D
 
O

Old Mod

80 linear metres of skirting tiles

Do u have to cut skirting a from main floor tiles?
How are u finishing the top edge, trim, grout, silicone, something else?
If it's trim, how many mitres do u have to cut at transitions?
External corners are there many?
Are they mitred tiles or trim or butted up?
Are the wall lines good? (Flat) is there packing out/up to do?
Then there's silicone between floor and skirting transition to do.

Just little things that often slip your mind when quoting I think.
 
S

Spare Tool

Sounds full on! 10mins for 1.2m!
130m2 to scrape,clean, sweep and maybe prime, that's not an hours work I know!
8m2 ish is probably one mix, if ur using rapid, sorry if I was using rapid I would want my bucket washed completely clean between mixes. (Otherwise shorter lot life time next mix)
Then the Ditra has to be rolled out cut and trimmed in possibly (if its multi room that's a fair bit of trimming) then tamped or rolled into the adhesive air extracted.
Are the joints taped? That's not a five min job if done correctly with Kerdi Coll.
I'm assuming @Dan that calculation applies to the whole day without any kind of break?
Not saying it can't be done obviously, I can't, its just an observation.
I also tend to use any little extra I make on installing Ditra for those silly hidden extras haha
Not disputing any of the above advice at all!
Just running the job past myself, out loud!:D
Hmmm now you put it like that think I underestimated, was just thinking about mixing and rolling out the ditra, good half a day in cleaning n priming. Could be nearer 3 days before you get a tile down with setting out..
I take it all back Diggy :)
 
O

On one

Do u have to cut skirting a from main floor tiles?
How are u finishing the top edge, trim, grout, silicone, something else?
If it's trim, how many mitres do u have to cut at transitions?
External corners are there many?
Are they mitred tiles or trim or butted up?
Are the wall lines good? (Flat) is there packing out/up to do?
Then there's silicone between floor and skirting transition to do.

Just little things that often slip your mind when quoting I think.
Hi 3-Fall. I see where your coming from......just like a prospective customer ringing you up out of the blue and asking what your £m2 is?
Hope the following helps you,to help me!
The skirting will be cut from the main tiles
No trims,just a grout finish to the top.
No external corners only internal corners,butted up,
Walls are good,
Siliconing,I am pricing as a separate item.
 
O

Old Mod

I thought I already tried to help! Haha
Asking u to break down the job into individual items so that u can put a time scale to it.
Personally tho, to fit ready made skirting tiles, not ones I have to fabricate labour only I'd be pretty close to the fivers people have already mentioned. I'd probably want more to make them as well!
I find when pricing I do the job in my head first, in the smallest of detail that I can, and break it down that way.
I find I'm less likely to make mistakes.
There's so much we do automatically in our job it's easy to overlook when pricing.
Just think it through and don't cut corners, your price is what it is mate, if u sell it right and convince them your the only guy on the planet capable of doing it, won't matter bout the price!
YOU CAN COME DOWN, YOU TRY GOING BACK UP! :)
 

AliGage

TF
Arms
Subscribed
Just spotted this. 3_fall and I did an 80sqm plank with tiled skirts. Ditra too with it up behind the skirts and banded with kerdi coll. It's not as quick to get down as you may think.
Long runs also increase the chances if air pockets under the ditra too. So factor in a roller (purchase ir hire) ad they come in very handy.
 

Reply to Skirting tiles & fitting uncoupling membrane in the Australia Tiling Forum area at TilersForums.com

Make sure to mark a post as a solution for better transparency.
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.

Advertisement

Birthdays

Top