got a 30m floor to level,only ever done small floors,used a flat trowel.
Ordered a spike roller from Ctd and the pole.
Is this the best way to go,pour out and roll it out or am I better to get a large level and drag over surface.
It's the old adhesive still on floor as customer saying its a nightmare to get up, and they'd rather I just self level it.
Ordered a spike roller from Ctd and the pole.
Is this the best way to go,pour out and roll it out or am I better to get a large level and drag over surface.
It's the old adhesive still on floor as customer saying its a nightmare to get up, and they'd rather I just self level it.