Kitchen tiles with UFH on T&G. Advice needed.

UK Tiling Forum; Established 2006

Welcome to the UK Tiling Forum by TilersForums.com, built in 2006 by Tilers, run by Tilers.

View all of the UK tiling forum threads, questions and discussions here.

Tilers Forums Official Sponsors

alright dave, what concistancy does mapei fibre plan have to be when mixing and do you just pour on and spread or is there a technique to doing it?
 
Hi and Welcome,

We would always Recommend Insulation board to be used on any type of subfloor as will help improve the performance of the system.

rough warm up times are as follows,

Uninsulated concrete - 3-5 hours (maybe longer depending on base thickness)
Insulated Concrete - 2-3 Hours
Timber - 30-60 Mins
Thermopanel or Ekoboard - 15-30 Mins

European standard IEC335/EN60335
recommends for safety that no more than 100W/m2 is installed directly on a timber floor and will only give you a 'Warm Floor' effect.
 

Advertisement

Thread Information

Title
Kitchen tiles with UFH on T&G. Advice needed.
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
11

Advertisement

UK Tiling Forum

Thread statistics

Created
ukdiyer,
Last reply from
Uheat,
Replies
11
Views
3,848

Thread statistics

Created
ukdiyer,
Last reply from
Uheat,
Replies
11
Views
3,848
Back