Search the forum,

Discuss first floor job in the UK Tiling Forum area at TilersForums.com.

S

stevee

ello lads,looks l;ike i might have my first job linedup

300sq trav area 2.5 x 1.4,nice and small to break me in:hurray:

hopefully ,itll lead to other work ,as hes a local builder ive known for 15 years , hes so busy he dosent advertise

one question is ,hes already got the addy BOND IT FLEXI CTA,any good?

concrete floor been down a long time,one linear ridge to take down somehow

will my TS60+ cut the trav,or do i need a wet saw?

thanks lads ,steve
 
S

stevee

hiya lads, sorry yes 300mm sq trav 2.5 x 1.4 area

captain slow , i will leave a professional finish to this job, but any odd bits of reassurance i welcome, im starting from scratch with a basic knowledge of tiling, and that is the reason i come to this great forum, reassurrance,guidance,tech help and advice i willingly soak up, cheers for your input boys ,steve
 
Last edited by a moderator:
T

Time's Ran Out

Captain - I was getting concerned and after being in contact with Stevee on another PM matter wondered why I would have been in the way!
I believe you are right with the basics and couldn't agree more with your comments.
However we all had to learn somewhere and at least he has asked first and that way he'll do it right.:thumbsup:

Stevee - Just make sure the substrate is clean/damp sponge.
Travertine seal - Sovergeign stone seal or Lithofin.

Timeless John.
 

Reply to first floor job in the UK Tiling Forum area at TilersForums.com

Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

Replies you've not seen

You're browsing the UK Tiling Forum category on TilersForums.com, the tile advice website no matter which country you reside.

Top