Hi, guys i've got some external steps to do, never done steps of anykind their concrete and pretty level and I was just after a bit of advice wether I should tile the risers first or the treads ( I thought the treads then riser is just like bottom cut on wall and would shed water better and make joint look nicer), thoughts much appreciated.
 
the tread always overlaps the riser,but i always like to do the tread first as i find it easier and i have tiled LOADS of steps.I find it easier to get the tiles in alignment,but whatever works for you then go for it m8.:thumbsup:
 
Whatever way you want to do it but the tread must overlap the riser and RE or REX tiles are usually used to form this edge but depends on the selected tile. I generally do the bottom riser first and place level along top edge starting on the bottom step.
 
Ime not with you their DS normaly you lay the tread first and the riser sits on top of it never seen any or done any different marble etc.
Lucius
 
The riser does sit on top of the tread but the tread must overlap the riser below which if you start at the bottom is laid first.
 

Advertisement

Thread Information

Title
External steps
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
19

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
obobsmith,
Last reply from
obobsmith,
Replies
19
Views
3,854

Thread statistics

Created
obobsmith,
Last reply from
obobsmith,
Replies
19
Views
3,854
Back