The screed is 100mm depth,it's a fibreglass/cement screed
custumer thinks 7.5 weeks as advised by Topps
builder said few weeks lol
i thought it was 1mm per day so 100 days,but not sure about it being mixed with fibre glass.
any help please
 
what make is the screed,? or which supplier ? or is it just an ordinary sand /cement/fibre glass ! how do you mean just fibres added to the mix or sheet material on top ?
 
Unless polymer modified the accepted natural drying rate of sand cement screed is 1mm per day. You can overlay it with a liquid damp proof membrane sooner but not if it has underfloor heating. You should not force dry sand cement screeds although a warm dry atmosphere will maximise the rate of drying. Not the best time of year for drying screeds I'm afraid.
 

Advertisement

Thread Information

Title
Drying time on a newly cement screed?
Prefix
N/A
Forum
Canada Tile Advice
Start date
Last reply date
Replies
3

Advertisement

UK Tiling Forum

Thread statistics

Created
Tilerbhoy,
Last reply from
Ajax123,
Replies
3
Views
5,115

Thread statistics

Created
Tilerbhoy,
Last reply from
Ajax123,
Replies
3
Views
5,115
Back