On one

Well I'm on one of those bathroom refurbs at the minute.......
1 Existing 18mm WBP floor had to come up because it had 20mm of old adh on,
2 Joists under the old shower tray sloped 18mm in 800mm,
3 Joists in the rest of the floor sloped 18mm in 2000mm in the other direction,
4 Customer didn't want to use tile trims on 600x600 porcelain tiles,
5 Plumber hung the shower door hinges on the wrong way(2 600mm tiles to replace,along with PB and tanking)
6 Three 40mm holes to cut for the shower controls,very close together and close to the edge of the tile,
7 Cacky grout,
8 Ran out of tiles,
9 Not enough room to swing a cat,
10 Plumber fitted the taps to the very heavy bath whilst on the landing........very heavy bath too wide to go through the door!
11 Plumber plumbs up the free standing bath to find the the previous plumber had cut 18mm off one of the wooden bath legs(150mmx100mmx500mm battens) to try and cure problem No3,
12 Replacement brackets for shower door glass panel taking a week to arrive,
13 Replacement brackets for shower door glass panel not an exact match,

as Jimmy Cricket used to say......''theres more''
 
Mmmm No?
Can't really blame the plumber.....just the customer giving him duff info and an unfortunate set of circumstances.
 
Will you replace the tiles f.o.c (no.5). What is happening about the trim? Mitre or butting up?
 
I replaced the tiles foc as the job will due to circumstances will end up being a time and materials jobs.
I managed to get my cut tile edges covered by a factory made edge on all the external corners
 
Might have gotten away with the sloping bath but the top edge of the bath was at exactly the same level as grout joint
 
Sounds like a great laugh!
im on my 3rd week of this bathroom refurb! Knocked 2 into 1, fitted new soil pipe under floor and loads of prep for free standing bath with free standing filler. Had to replace complete floor at extra cost as it was knackered oh and then they decided on travertine instead of ceramic without telling me and I had already plaster boarded! Oh and was meant to be amtico on the floor but now tiles!
 

Advertisement

Thread Information

Title
Do you ever get a job where nothing at all goes right?
Prefix
N/A
Forum
Australia Tiling Forum
Start date
Last reply date
Replies
18

Advertisement

UK Tiling Forum

Thread statistics

Created
On one,
Last reply from
White Room,
Replies
18
Views
464

Thread statistics

Created
On one,
Last reply from
White Room,
Replies
18
Views
464
Back