S
surflaur
I am looking at doing a 23m squared floor, quite straight forward apart from where it goes from floorboards to a chipboard extension there is roughly a 3 to 4mm difference. Both floors are level so it is an immediate drop.
The tiles are 450 X 450. I was going to put some screed on to the lower floor and feather it out over a meter or so then go ahead and lay the ply etc.
Is this the way to go or is there a more obvious way?😕
The tiles are 450 X 450. I was going to put some screed on to the lower floor and feather it out over a meter or so then go ahead and lay the ply etc.
Is this the way to go or is there a more obvious way?😕