S
SJRuss
Hi guys - a thought occured to my plumber the other day as he was putting in the c/heating system,
I'm having a 75mm screed installed in the kitchen to bring the level up. Before the screed goes down, he suggested putting a run of speedfit pipe down and hooking it up to the heating system?
I know the boiler is large enough to contend with the extra run and that it would have to be controllable off the boiler itself, but would it actually be worth doing? There's going to be another 20mm s/cement bed to lay the 25mm calibrated sandstone - I guess that's a fair depth of material to feel the heat through?
Just seems a bit of a bad/pointless idea to me or am I looking into it too hard as usual!?
Thoughts would be appreciated!
Si.
I'm having a 75mm screed installed in the kitchen to bring the level up. Before the screed goes down, he suggested putting a run of speedfit pipe down and hooking it up to the heating system?
I know the boiler is large enough to contend with the extra run and that it would have to be controllable off the boiler itself, but would it actually be worth doing? There's going to be another 20mm s/cement bed to lay the 25mm calibrated sandstone - I guess that's a fair depth of material to feel the heat through?
Just seems a bit of a bad/pointless idea to me or am I looking into it too hard as usual!?
Thoughts would be appreciated!
Si.