todays repair

UK Tiling Forum; Established 2006

Welcome to the UK Tiling Forum by TilersForums.com, built in 2006 by Tilers, run by Tilers.

View all of the UK tiling forum threads, questions and discussions here.

Tilers Forums Official Sponsors

F

faithhealer

called in to repair dot and dab shower, not too bad, wall still intact but noticed ALL the floor tiles were detached from his 6mm ply! All good fun. But a mate of mine was following on from the same tiler who has left 15mm gap to silicon round the bath and 50mm yes Fifty mm gap at the ceiling height, which he has filled in with grout!! Waiting for him to email the pics over!! This tiler did what I would quote two days to do, in 6 hours!
(Dave, the tiler I mentioned last week)
 
sounds like a bit of a feature
you could put a bloody border in between the last tile and the ceiling! surely no-ones that bad they mis-cut something by 50mm and think its fine and keep doing it:yikes::yikes::yikes:
 
If its all the way round it can't be a miscut. Unless he measured first one wrong, set-up the cutter and just ran 'em off without checking. Not on really, is it.
 
View attachment 18735just saw one today poor setting out and thats a 8mm slither on shower base:mad2: (not guilty)


he started full tile over bath at other end of room
 
Last edited by a moderator:

Advertisement

Thread Information

Title
todays repair
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
13

Thread Tags

Tags Tags
repair usa

Advertisement

UK Tiling Forum

Thread statistics

Created
faithhealer,
Last reply from
user123,
Replies
13
Views
272

Thread statistics

Created
faithhealer,
Last reply from
user123,
Replies
13
Views
272
Back