Morning everyone, I looked at a job last night that customer wants 45sqm limestone tiles fitted where a conservatory has been converted into a dining room off the kitchen.
A new solid roof has gone on and windows replaced, the sand/cement screed in conservatory needs slc to bring up to kitchen screed level, 10mm max
The opening into the now diner is now 3m wide, I’ll grind the old adhesive off kitchen floor then slc as required with diner slc
Would you use matting and/or exp joint at the point crossing between areas?
A new solid roof has gone on and windows replaced, the sand/cement screed in conservatory needs slc to bring up to kitchen screed level, 10mm max
The opening into the now diner is now 3m wide, I’ll grind the old adhesive off kitchen floor then slc as required with diner slc
Would you use matting and/or exp joint at the point crossing between areas?