I guess either way works. As long as there is a gap to allow for movement then everyone is a winner
seems that you guys that do the wall first do it one of two ways, some of you tile to the floor and then the floor to the wall tile, and some of you leave the lower course off then do the floor and then finish the wall.
What is technically 'best practice' for this?
Cheers
you don’t have to be to accurate with your bottom cuts that way. Plus you have a bit of adjustment flexibility which will be covered by the floor later.