Tile Forum | America Tile Forum

Welcome to America Tile Forum, the USA Tile Industry. The Tile Association of America.

Discuss Slate over Anhydrite screed - commissioning a in the America area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




Ajax123

TF
Esteemed
Arms
Reaction score
934
So some feedback from the bat cave: the decision is to go for a thermal shock using a hired-in boiler. Screed supplier is suggesting 7 day shock cycle given that no additioinal time is required for drying (usually the boiler would be hired out for a 3 week period). Thanks again for all the advice - much appreciated.
7 day cycle is insufficient and likely to crack your screed. You should follow the procedure here. See post installation section.
 

Attachments

  • Gypsol-Underfloor-Heating-Guide-02-01EN19-08.pdf
    232.5 KB · Views: 16

Reply to Slate over Anhydrite screed - commissioning a in the America area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

Please note that this thread is old so replying to it may not get a response. You'd be best posting a new thread with a good 4 or 5 word title.
This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,367
Messages
881,195
Members
9,530
Latest member
Apatel
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks