Hi guys,

Been to look at a job where 2 floors (Chipboard & concrete screed meet) a couple of the tiles that are laid at the moment have come loose so there must be movement in the chipboard extention, was thinking over boarding the whole floor with cement board making sure to over lap where the 2 floor meet. Do you guys think this would be substantial? Welcome to any suggestions..
Thanks in advance
 

Reply to Screed to chipboard sub floor in the General Off-topic Chat (nothing tile) area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

There are similar tiling threads here

    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
403
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
590
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
744
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
540
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
2
Views
522