neologic2k

Agree make sure the joints are clear of adhesive, but they do allow a beginner to get the end lines perfectly for each tile.
 
N

neologic2k

I used all bal product, bal tanking, addy and grout. The adhesive was pre mix, but allow 7 days before grouting so should be dry.
 

Reply to Newbuild shower tiling nightmares! in the Tanking and Wetrooms area at TilersForums.com

There are similar tiling threads here

    • Like
  • Sticky
Water Damaged Shower Repairs Shower tile repair – water damage – tile waterproofing Do you...
Replies
0
Views
2K
Hello there, Relatively recently we had a new en-suite fitted (complete rip out of the old...
Replies
5
Views
2K
    • Like
A little help guys. I've been asked to price 71sqm of limestone flooring. My issue is this...
Replies
2
Views
289
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
701
Hello, I'm just a home owner who doesn't have much experience with tiling but I'm looking for...
Replies
12
Views
2K
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top