Discuss LVT rise every few years over CH pipe in sub floor. Martin. C in the America area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




Reaction score
0
Tiles laid over SLC . First time it happened put down to Xmas disaster, causing turkey fat to soak into concrete. Detergented, but repeat. It appeared that SLC expands locally, loses bond, breaks and arches up. As only two tiles are affected, I can lift, clear broken corners of SLC and pack gap to allow expansion. What would be recommendation-The SLC is about 10mm thick. Ply piece, fitted in loosely, bonded to concrete and tile with acrylic high temp adhesive? Pipe run only affects tiles in limited small areas. This must happen fairly often, but nobody owns up, and two adhesive companies had not heard of prob.!
 

Reply to LVT rise every few years over CH pipe in sub floor. Martin. C in the America area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

Replies you've not seen

New Tiling Questions

UK Tiling Forum Stats

Threads
67,359
Messages
881,151
Members
9,532
Latest member
Matthew77
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks