Drying is a mass transfer process consisting of the removal of water or another solvent by evaporation from a solid, semi-solid or liquid. This process is often used as a final production step before selling or packaging products. To be considered "dried", the final product must be solid, in the form of a continuous sheet (e.g., paper), long pieces (e.g., wood), particles (e.g., cereal grains or corn flakes) or powder (e.g., sand, salt, washing powder, milk powder). A source of heat and an agent to remove the vapor produced by the process are often involved. In bioproducts like food, grains, and pharmaceuticals like vaccines, the solvent to be removed is almost invariably water. Desiccation may be synonymous with drying or considered an extreme form of drying.
In the most common case, a gas stream, e.g., air, applies the heat by convection and carries away the vapor as humidity. Other possibilities are vacuum drying, where heat is supplied by conduction or radiation (or microwaves), while the vapor thus produced is removed by the vacuum system. Another indirect technique is drum drying (used, for instance, for manufacturing potato flakes), where a heated surface is used to provide the energy, and aspirators draw the vapor outside the room. In contrast, the mechanical extraction of the solvent, e.g., water, by filtration or centrifugation, is not considered "drying" but rather "draining".

View More On Wikipedia.org
  1. G

    drying out fresh screed...

    My customer is having piped UFH installed in a couple of weeks into a new conservatory (20sqm). Assuming that it's going to be approx 60mm screed, am I right to say 1 day per mm for drying??? She is impatient and doesn't want to wait so what can be done to speed up the drying? Dehumidifier...
  2. C

    Bal Fastflex Drying time

    Hi guys been reading the forum for a couple of weeks, never realised there was so much to tiling but it has been a great learning curve thanks! I am doing a bathroom in a flat I own which is chipboad on joists screwed down, then as you guys seem to recomend, 12mm wbp ply at 100mm centres...
  3. K

    1st timer - grout cracking after drying out

    Hi, I hope you guys don't mind me asking questions. I re-tiled my kitchen this weekend and it all went well - grouted last night and it all looked really good. This morning - all the grout has cracked as it's dried out leaving tiny cracks and some holes. I used a ready mixed addy/grout...
  4. M

    help need with plaster drying times.

    hello, been trying to look up the answer but cant find anything on the forums. customer just had a full room plastered at the weekend and im booked in to tile it on thursday morning, will be ok to tile onto by then? and will i have to prime it, im 99% sure i am like. cheers.
  5. M

    Floor screed drying time - advice please

    I'm having a 65mm thick ready mix floor screed laid tomorrow over, what would you recommend is the earliest time I could lay 60 x 60 porcelain floor tiles on it. Bit desperate as i cant install the toilet until the tiles are laid - or any ideas - its a back to the wall loo. many thanks Great...
  6. CJ

    Screed drying times.

    Wot are the drying times for screed with piped UFH I was always under the impression that it is around 25mm per week.........or is that bull:confused: Builder is laying 65mm onto pipes soon.......and punter wants it tiled as soon as.
  7. B

    Drying Time For Plastered Walls

    Do You Have To Leave Plastered Walls 4 Weeks To Dry Before Tiling And Do They Have To Be Primed
  8. M

    Tanking Drying Time?

    Re: Any new tilers stuck at all, with anything? Whats the shortest time you've left a newly applied Tanking kit (bal) before tiling on it? They reckon 24hrs but...............?