hi lads
I don't often work along side many tiles I am a one man band, I am just woundering how many meters a day lads expect to lay a day dazed on laying 600x900x20 limestone floor tiles on a three mil joint. The floor is fairly average and laying on to ditra Mat.
Areas are approximately 50meters in area cuts to all walls !
Be interested to hear what the thoughts are !
I don't often work along side many tiles I am a one man band, I am just woundering how many meters a day lads expect to lay a day dazed on laying 600x900x20 limestone floor tiles on a three mil joint. The floor is fairly average and laying on to ditra Mat.
Areas are approximately 50meters in area cuts to all walls !
Be interested to hear what the thoughts are !