Mains Cable Route Electrical Advice

Tilers Forums Official Sponsors

Mains Cable Route Discussion ThreadMains Cable Route Electrical Advice

Hi guys I have been asked to carry out an EICR on a unit which is part of a large shed/warehouse (which back in the day was a big open planned building). The mains cable which supplies the unit (PVC/PVC tails) is routed through the full building in steel trunking which passes through various businesses before it gets to the unit that is being tested. The building/installation is approx 40 years old so unsure if this was ok at the time as I think it was maybe the first business that was converted from the original large open plan warehouse. Is this something that should be highlighted on the report? Is a warning label on the trunking enough to keep myself covered?

Mains Cable Route for the original thread on Electricians Forums
 

Advertisement

Thread Information

Title
Mains Cable Route Electrical Advice
Prefix
N/A
Forum
Electrical Advice
Start date
Last reply date
Replies
0

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
Lou,
Replies
0
Views
149

Thread statistics

Created
Lou,
Replies
0
Views
149
Back