Went to start a 40m2 patio floor around a new koi carp pond on finished screed with drains around the house and pond, on close inspection none of the drains are connected and to top it all the screed is direct on to chalk,I got someone in to have a look and now the whole lot has got to be removed and redone,the builder has said that everthing was done under building control yer right,the customer has decided not to have him back.
Should say Bodgy Builder.
Should say Bodgy Builder.
Last edited: