Hi was wondering how much ud charge to prime the sub floor and lay underfloor heating, 2.5m2 floor of 600x600 porcelain,13m2 of 600x300 wall tiles on 3 walls and a 4m2 feature wall once again of porcelain 600x600 and grout the lot.
Floor sub is ply already installed and walls new plasterboard.
No idea and just wanting a ball park figure not including materials, and recon it will take about 5 days in total,?
:huh2:
Thanks again
Floor sub is ply already installed and walls new plasterboard.
No idea and just wanting a ball park figure not including materials, and recon it will take about 5 days in total,?
:huh2:
Thanks again