E
easyt
I have just removed a cast iron bath and intend to replace it with a shower. Beneath the bath there is only bare bricks. Under the existing tiles is a sand/cement render. I wil remove the tiles above and re-tile. The area beneath I will have to render. How long before I can tile over? How do I reduce the time from rendering to when I can tile over ??
EasyT
EasyT