macten TF Esteemed Arms Jun 19, 2011 #1 I tiled the hall a few months ago but stopped due to level problems but have had a couple of spare weeks so got the floor finished and did the splashback:
I tiled the hall a few months ago but stopped due to level problems but have had a couple of spare weeks so got the floor finished and did the splashback:
macten TF Esteemed Arms Jun 19, 2011 #4 The white switches and sockets looked naff so swapped them for nicer ones and installed the cabinet downlights.
The white switches and sockets looked naff so swapped them for nicer ones and installed the cabinet downlights.
macten TF Esteemed Arms Jun 19, 2011 #6 The low sill level above the sink was wrecking the mojo so bumped it up a bit to a tile's height: These porcs weren't full bodied in colour - didn't want to trim so used matt black tile paint on exposed edges: Attachments P5280270.jpg 25.1 KB · Views: 69 Last edited: Jun 19, 2011
The low sill level above the sink was wrecking the mojo so bumped it up a bit to a tile's height: These porcs weren't full bodied in colour - didn't want to trim so used matt black tile paint on exposed edges: