I
Ian
For that money it should be perfect, the rads should have come off so the pipes could be cored tight, the cuts for architraves are poor and the gap at the shower is just poor setting out. If it was a £20 per m job it's almost acceptable........ actually no it wouldn't.
Last edited by a moderator: