Tile Forum | America Tile Forum

Welcome to America Tile Forum, the USA Tile Industry. The Tile Association of America.

Discuss Preparation of Concrete Blocks before tiling (outdoors) in the DIY Tiling Forum area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




Reaction score
0
Hi - I'm just having some concrete block walls built in the back garden and I intend to tile these with 30 x 60 8mm porcelain tiles.

Couple of bits of advice please.

1. How long do I need to leave the wall after building before I tile?
2. Do I need to prime the blocks before tiling, or can I tile direct?
3. Will 8mm adhesive bed be sufficient?

Many Thanks in advance.
 

Bond

TF
Arms
Reaction score
270
some general information regarding your questions, l would probably want to leave tiling for about two months. Preparation would be to hose down wall Apply priming solution. Would use a 12mm notched trowel on wall and back skim tile. Lots of other things to consider like weathering detail at top of wall. Construction joints (depends on height and length of wall). Tiling to both faces? If not weathering detail to other face.
 

Reply to Preparation of Concrete Blocks before tiling (outdoors) in the DIY Tiling Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

Please note that this thread is old so replying to it may not get a response. You'd be best posting a new thread with a good 4 or 5 word title.
This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,371
Messages
881,208
Members
9,534
Latest member
Lowpaul22
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks