How to Set Out Around Bath With Shower

UK Tiling Forum; Established 2006

Welcome to the UK Tiling Forum by TilersForums.com, built in 2006 by Tilers, run by Tilers.

View all of the UK tiling forum threads, questions and discussions here.

Tilers Forums Official Sponsors

F

Fiesta14

Hi

Having a go at wall tiling for the first time but need a pointer before I start. Could someone please give me an idea of how to set out tiles around a bath that also has a thermostatic shower at one end. The shower unit has two pipe tails which have to be tiled around. Do I start at the pipes and work from there or start on the long wall and nibble or drill the tiles as needed when I get to the pipes. The ceramic tiles are 200 x 250 x 6.

Any help would be greatly appreciated.

Matt
 
start from the bath and tile upwards, drilling the holes for the pipes. Best to have cuts onto the bath as most baths aren't truly level.
 
Disconnect the shower unit and cap off the pipes.
Check the bath for level and staff out the number of tiles to the ceiling.
If by starting a full tile off the bath it gives you a good cut to the ceiling (i.e over 1/2 tile) go with that and drill the holes for the pipe outlets.
 
For the best end result make sure you put a line down the centre each wall to give even cuts at both sides. Either tile with a full tile off this line or put the centre of a tile on the line, whichever leaves you with the biggest cut when you get to the wall
 

Advertisement

Thread Information

Title
How to Set Out Around Bath With Shower
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
3

Advertisement

UK Tiling Forum

Thread statistics

Created
Fiesta14,
Last reply from
peteablard,
Replies
3
Views
1,488

Thread statistics

Created
Fiesta14,
Last reply from
peteablard,
Replies
3
Views
1,488
Back