Tile Forum | America Tile Forum

Welcome to America Tile Forum, the USA Tile Industry. The Tile Association of America.

Discuss How long do you wait before laying Ditra onto fresh Self levelling? in the Canada area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




L

LJD

S/L went on yesterday . 10 mm thick .Plenty of air movement to dry. When can I lay Ditra mat ? And should I seal with SBR first ?

Thanks
 
L

LM

Once the leveller is dry and you shouldn't need to prime it however it'll slow down the time it takes the adhesive to dry which in turn will give you more open time to fit the Ditra.
 

Reply to How long do you wait before laying Ditra onto fresh Self levelling? in the Canada area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

Please note that this thread is old so replying to it may not get a response. You'd be best posting a new thread with a good 4 or 5 word title.
This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,367
Messages
881,195
Members
9,530
Latest member
Apatel
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks