peter241
Hi every-one, sory i havent been on for a while, ive been up to my eyes in work. (its about time) LOL.
Any way i have a job comin up 900m2, 3 of the rooms require self leveling. (100m2) i havent attempted this amount of leveling before and was looking for some advice.
I normaly use a 20 kg bag of multiflow screed for leveling.
Can anyone advise me on the best way to tackle this project?
Do i use the 20kg bags or can i get the leveling compuond in a mixed form? or should i contract the job out?
Any advice would be apreciated
Peter :whatchutalkingabout