Hi

I am in the process of fitting a new En suite out and have recently bought a 2m2 heat mat with digital timer. So far I have chased through the walls, ran the electric feed to a fused spur (3A - it's only 150w rating) and ran conduit to the floor ready for the mats cables. The question I have is around the process and a couple of niggles.

The plan is to use the supplied thermal primer compound to prep the newly laid wooden T&G floor boards
(I have enough for 10m2 so thought i'd use that instead of buying something similar), then use a flexible tile adhesive to lay 10mm insulation boards, filling any gaps with adhesive. I'll then prime the insulation boards with the thermal primer before laying the mat, testing the mat, then screeding over ready for tiling with 10mm 60x60 polished porcelain.

I have asked this on another part of the forum and had 1 answer, but the instructions are a bit vague. The cold/hot feed bulky connection that needs setting in tile adhesive? My plan was to hide this in the lower wall, sunk in tile adhesive then a wall tile on top (I've made a recess of about 30mm) - presume the recommendation to sink in tile adhesive is to spread the heat about. Another forum member suggests cutting into the insulation board and screeding over but the instructions say specifically not to do this due to overheating and premature failure, the insulation board obviously retaining any heat the connection gives off. What do you chaps do?

Second query is around the door trim. I am going to buy a chrome z door trim that can be hammered down (with a lump of wood), to accept 25-30mm given the 10mm board, screed, mat and 10mm tiles. Luckily i have a decent depth carpet on the other side to hide this - are there any other trims worth looking at? I'm conscious that it may look tacky in chrome? or is this standard....I am also wondering what to do when screeding, do i put a piece of wood in place of the door trim to screed up to then remove to fit the door trim once tiled?

Thanks in advance and sorry for all the amateur questions :)

Tim
 
F

Flintstone

I think it was me who mentioned about the bulky connector. I have used that method for many many installations without a problem, you just need to dig out about 3mm of the insulation board to make the cold tail connector sit at the same height as the rest of the wires, then it ensures that it all gets coated in levelling compound. Putting the connector in the wall risks having an area that's not properly covered somewhere between the floor and the wall. That's my opinion anyway !
 
Last edited by a moderator:
O

Old Mod

Who's UFH system is this?
I have always sank a small amount of the large cable in to the substrate partly.
You have to, otherwise you're looking at a massively thick layer of slc.
If it's a timber floor, I'll chisel it out, if it's insulation boards I'll cut a channel.
And if you didn't then a small part of the heating cable would have to be left exposed, because of the transition between the two, and that's not right.
I can't see a problem with this, I'd be interested to read their instructions.
 

jobdone

TF
Esteemed
181
543
Chobham
As above chanel out the boards for the cold tail and the flexible conduit for the probe. I find it best to always use conduit for the probe as it can then be changed if it fails, I even do this with ditria heat.
Trim the edge of the tile in to the door way then the carpet can be finished into it leaving a neat finish imp.
 
1

1animal1

Hi, sorry for the late reply, the brand is Nass boards. I'll try and take photos of the instructions tomorrow. As mentioned above though they state that the connector should be under the tiles, encased in adhesive or screed... With an important note to not just cut out the insulation and cover with tape as it risks overheat. That must be the element I missed.... As it wouldn't be encapsulated in adhesive or screed.

Regards the door, do I just use a piece of wood to replace the trim for now until the jobs complete?
 
1

1animal1

Local, I think it was you that commented mate, on reflection my question is void :) thank so much for the advice... Same to everyone else who's commented. I've already ran the conduit but have another piece spare that goes to the floor past the void I've carved out. Fingers crossed it all works when powered up! :) Any thoughts on using the thermal primer to prime the floor boards, it should be OK shouldn't it?
 
O

Old Mod

I had an old teacher :D

Haha that'd explain it!
happy-thumb-up-045.gif
 

Reply to Electric mat installation in the Tiling on Underfloor Heating area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

    • Like
I have a customer who lives in a 200 year old property. The lounge floor he wants tiled which...
Replies
2
Views
1K
    • Like
Hi everyone, With a kitchen renovation, Mrs choose the white mirror quartz floor tiles from a...
Replies
4
Views
1K
I'm planning on tiling my porch, and the tiles and adhesive will take up around 13mm of height...
Replies
2
Views
609
    • Like
Hi everyone I am building my own house and now I'm ready to tile the floor downstairs. I have...
Replies
1
Views
1K
I’m nearly there with a bathroom tiling Project and managed to make it this far before getting...
Replies
0
Views
2K

Underfloor Heating Trending Threads

Advertisement

Thread Information

Title
Electric mat installation
Prefix
Forum
Tiling on Underfloor Heating
Start date
Last reply date
Replies
31

Thread Tags

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 5 5.0%
  • Kerakoll

    Votes: 8 8.0%
  • Ardex

    Votes: 6 6.0%
  • Mapei

    Votes: 24 24.0%
  • Ultra Tile

    Votes: 14 14.0%
  • BAL

    Votes: 28 28.0%
  • Wedi

    Votes: 3 3.0%
  • Benfer

    Votes: 2 2.0%
  • Tilemaster /Kelmore

    Votes: 19 19.0%
  • Weber

    Votes: 18 18.0%
  • Other (any other brand not listed)

    Votes: 11 11.0%
  • Nicobond

    Votes: 5 5.0%
  • Norcros

    Votes: 3 3.0%
Top