I used to work on a very rough rule of thumb of 6sq/m of finished work a day (that's grouted). That'll be an 18sq/m bathroom tiled, grouted and silconed in 3 days. Usually and earlyish day on day three.

I always cut as I went. Nothing worse than cutting the next day and finding you need to move a set tile by 1mm.
 
I get 2 days to do a 7m2 kitchen floor a 3m2 bathroom floor and 17m2 of bathroom walls,fortunately the pot life of the adhesive is minutes instead of hours,thats not negotiable either as second fix plumbing happens the day after i finish ,not my rules but what i have to do to get paid.
 
Mz30 thats a hell of a lot of meterage your covering!, cant be many cuts with all that, so basically in 2 days your doing, 27m2 all tiled and grouted?....u must reply on red bull lol!!
 
Mz30 thats a hell of a lot of meterage your covering!, cant be many cuts with all that, so basically in 2 days your doing, 27m2 all tiled and grouted?....u must reply on red bull lol!!

I wish the werent that many cuts mate on the walls thers a shedload,to be fair the floors are easy 2 to 3hrs max to tile an hour to grout,gives time to get a decent start on the walls.

Wish i could drink red bull ,but caffeine cripples me.
 
Housing association or council im guessing? I feel they ask too much to be done, especially if your on a day rate, rather than meterage.. But work is work and if your getting it done in line with their schedules and getting paid then your sorted.

I dont have a specific meterage to get done in a day. I just work at a steady pace. If at the end of the day ive tiled alot then I pat myself on the back lol.

Everyone works at different speeds and every job is different in complexity so you cant really give an idea.
 
yes mate housing association,but using porcelanosa tiles so a higher spec than the standard 6x6 white ,tbh i dont really find it that hard,am usually finshed handy most days,if it was difficult i wouldnt do it.
 
It's amazing the metres you can put down when doing the same thing day in day out. Used to do prefab 25m bathroom pods, walls, borders and diagonal floors. Perfectly squarely engineered so all cuts identical. We were tiling one each for 2.30, grouting the previous day's work and in the house before 4pm every day. Miss those days but it was mind numbingly boring.
 

Advertisement

Thread Information

Title
Average metres
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
27

Thread Tags

Tags Tags
aus usa

Advertisement

UK Tiling Forum

Thread statistics

Created
Scottie25,
Last reply from
Peter,
Replies
27
Views
5,520

Thread statistics

Created
Scottie25,
Last reply from
Peter,
Replies
27
Views
5,520
Back