Hi all
So I've got over 200 metres on this floor to do
Main area of around 80 and rooms off from this
Concrete been down over 3months so about right for tiling
It's got wet ufh that has been pressure tested but not had water through it
Does it need the ufh on and up to temperature and commissioned
Allowed to cool then tile
Or can it be tiled then ufh brought up gradually
Thanks in advance
 
It needs to be commissioned and up to temperature etc then let cool down then it should be ready for Tiling.
Won’t hurt to test it for moisture.
 
Are you sure it’s concrete?
If it’s gypsum it will need to be sanded, commissioned, heated, dried, moisture tested, primed. Then tiled.
 
Yea sure it's concrete
I'm assuming the commissioning allows the floor to expand
Before the tiles are installed
But is that not the same as bringing it up gradually ?
Thanks
 
Yea sure it's concrete
I'm assuming the commissioning allows the floor to expand
Before the tiles are installed
But is that not the same as bringing it up gradually ?
Thanks
No it’s not. Concrete can warp and move while it dries out, you’d want that all out of the way before anything else.
 

Advertisement

Thread Information

Title
Advise on concrete floor
Prefix
N/A
Forum
Canada Tile Advice
Start date
Last reply date
Replies
5

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
merit,
Last reply from
merit,
Replies
5
Views
3,277

Thread statistics

Created
merit,
Last reply from
merit,
Replies
5
Views
3,277
Back