2391-52 help please

  • Thread starter Thread starter Kaya12
  • Start date Start date

Tilers Forums Official Sponsors

During Periodic Inspection and Testing, prospective fault current has been tested at the main distribution board (Main DB) using a single-phase test instrument.

The supply and installation form part of a 400 V three-phase TN-C-S system. The value of Zₛ (earth fault loop impedance) for this installation is 0.05 Ω.

Information about the protective devices installed at the remote distribution boards (DBs) is as follows:

Main DB: 3 phases, 10 kA
DB1: 3 phases, 7.5 kA
DB2: 3 phases, 7.5 kA
DB3: 1 phase, 7.5 kA
DB4: 1 phase, 6 kA

At which points in the installation must further testing be carried out?

a) DB1 and DB2
b) DB3 and DB4
c) DB1, DB2 and DB3
d) DB1, DB2 and DB4

Continue reading...
 

Advertisement

Thread Information

Title
2391-52 help please
Prefix
N/A
Forum
Electrical Advice
Start date
Last reply date
Replies
0

Thread Tags

Tags Tags
None

Advertisement

UK Tiling Forum

Thread statistics

Created
Kaya12,
Replies
0
Views
45

Thread statistics

Created
Kaya12,
Replies
0
Views
45
Back