screed
Screed has three meanings in building construction:
A flat board (screed board, floating screed) or a purpose-made aluminium tool used to smooth and to "true" materials like concrete, stucco and plaster after they have been placed on a surface or to assist in flattening;
A strip of plaster or wood applied to a surface to act as a guide for a screed tool (screed rail, screed strip, screed batten);
The material itself which has been flattened with a screed (screed coat). In the UK, screed has also come to describe a thin, top layer of material (sand and cement, magnesite or calcium sulphate), poured in situ on top of the structural concrete or insulation, on top of which other finishing materials can be applied, or the structural material can be left bare to achieve a raw effect.
Hi ive been asked to screed over an area of 65 sq m a entire ground floor in a house ( ive not seen the property yet so not sure of the room layouts)
its to go over electric UFH system
And it will be engineered laminate for most of the areas except the kitchen which will be tiled.
what would...
After a total cowboy ripped off my disabled mum and made a huge **** up of her kitchen...non cured floor screed as strong as a sandcastle...self level thrown on top of said sandcastle then tiled on top with predictable results! He had the floor running to the sink by about 50mm over 2 metres...
got a job coming up where the stone floor has failed to a degree.
anyway i have to take up the existing limestone which was bedded in cement based si adhesive.
when doing a test some of the adhesive comes off anhydrite screed and some stays stuck to screed.
i think best way forward is to take...
hi everyone I'm a tiler with 27 years experience
not been on here for years but I have a question if you tile an calcium hanhidright screed and in 6 months they all come loose who is to blame ? the client said the screed was dry so top was sanded of then primed 3 times with acrylic primer then...
royalkal
Thread
canada
debonding
lifting
screed
tile
tiles
tiling
would
Ok, I'm a bit confused. I've been talking to my customer about her bathrooms as she is having mostly wet rooms. She has said the waterproofing is being done under the screed. Is this normal practice abroad?
Hi,
I've been getting quotes for tiling my kitchen floor - approx 28m2 currently tiled with ceramic tiles on concrete / screed base. These are solid and seem well fitted.
The existing tiles are perfectly good, we are just replacing them because they were the standard tiles fitted when built...
Evening all
Can anyone recommend a liquid screed supplier in Sussex for a job I'm on.
It's not being tiled just engineered flooring laid.
Any help appreciated.
Cheers
Looked at a job, client wants to fast track tiling a new floor with a heat mat.
This is what they have come up with..
75mm sand and cement screed
After 3 weeks apply tilemaster prime and grip......wait 7 days, install heat mat and cover with tilemaster floor flex slc, when dry, tile with...
Hello ladies and gents
Asking for a bit of advise from those of you with a bit more experience with green screeds. Floor went down a week ago, was going to tile with bal green screed, put a level on the floor earlier today and ohh dear, I've seen smaller lumps and bumps on a page three girl...
Hi all
I'm wondering if I could get any advice on a problem I have with an anhydritic screed recently installed.
Story:
~ 10 days ago, we had a screed laid over UFH pipes. It was supposed to be Truflow B. I had my hands full and also had to leave the house whilst this went down.
...The...
Please could someone tell me if I am doing this in the correct manner.
The screed was laid mid may 2016, I have just removed the laitance layer with a STR 701 floor preparation machine and now have a lovely white floor.
I plan to seal the screed with primer G, with a single coat of 1 to 1 and...
hey all just got a job that requires me to tile 150m2 floor using porcelain wood effect plank tiles
the main area ill be tiling is around about 100 m2 with the other 50m2 spread over the house in hallways..bathrooms etc
the thing is the main area ill be tiling (100m2) is a power floated...
Massettomix PaRis 2.0 - Laterlite - http://www.laterlite.com/products/paris-2-0/
Today, I came across this type of screed.
ever seen, up to 150 square meters, without joints to the doors.
heating UHF.
fibers, seem aluminum (type Christmas tree).
Just looking for some clarification.
I have a 28 sq metre screed slab, Gyvlon Thermio liquid screed, with wet UFH. The laitance has been taken off and it's fully dried. There are no cracks.
After its been primed with APD, will BAL rapid set flexible fibre be ok without a decoupling mat?
The...
as above , got an 80mm sand and cement screed to tile, been recommended I use an acrylic primer to help the adhesive bond with the slab. Went to topps tiles today and asked for acrylic primer, got home and realised they have given me bond, it does say can be used to seal screeds, but just...
Brody29
Thread
adhesive
bal
bal adhesive
bond
building adhesives
grout
priming
sbr
screed
I'm due to tile a conservatory floor next week which was only screeded last week. The customer has been assured by the builder that it will be fine as an accelerant was added to the screed before laying. I always leave at least 4 weeks to dry out. Customer will make the decision, but I'm not...
Fast-setting, self-leveling, polymer-modified cementitious screed, used for smoothing and leveling concrete or mortar floors, before laying finishing materials like ceramic tiles, moquettes, parquet, vinyl tiles etc. It can be used at a thickness of 1-10 mm. Ideal for quick repairs, as it is...
How long do you think it will take to dry out this screed? Been down 90 days, 50mm thick so should have been dry at 60 days! Plastering has been going on so can't have helped? This is what the tramex read a few days ago. Got dehumidifier in and getting customer to get the pipe temp up to 50...
Just taken some quarry tiles up in a utility room the she's I've has come up as well leaving a bitumen coated sand and cement screed. Is there any way that this can be left and leveled over.
I think the answer is no and there will be much scraping.