hi peeps,,got a rip out job coming up where 2 tiled floors need to be lifted 1st and re plyed..lifted a floor recently that someone else had botched and it was only down for 2 weeks so it came up easy,,the 2 floors total 18 sq metres how long realisticly do you think it will take to lift these...
Richards at 365 Drills thread asks a very important question whats ethical
http://www.tilersforums.com/tilers-forums-arms/9739-right-ethical-just-good-idea.html
i have noticed a lot of tilers seam to be reluctant to price jobs on a meter rate preferring a day rate is it because they are to...
tiled and grouted kitchen floor other day, looks ok (my own, not a tiler) had a couple of metres of tiles left so today decided to put them on bathroom floor. got the half bag of adhesive out, mixed it up, laid tiles. went back to bag to see how long before i can grout, and discovered i have...
What might people charge for the following job.
-Rip out bath, basin, toilet
-Remove tiles 10 sq m
-Fit new shower tray (different position than existing waste etc), new basin (different position) & new toilet (re position)
-Run new pipework for shower, basin, toilet
-Tank shower area
-Fit new...
infidel
Thread
bathroom
help
out
please
quote
replace
riprip out
tile
usa