Not ideal, but as it's for you and not a paying customer i'd say at 400c/c screwed down every 150mm you'd probably be ok.
Make sure a flexible ady is used.
If I go for screwing 18mm wpb down every 150mm along the joists do I also need to fit noggins across the joists so that the noggins are 150mm apart (centres). That would allow me to screw along the noggins every 150mm as well so I can see it makes sense - just sounds like a lot of noggins.
Up for doing a thorough job so don't mind that many noggins - just want to make sure before going too far.
If I go for screwing 18mm wpb down every 150mm along the joists do I also need to fit noggins across the joists so that the noggins are 150mm apart (centres). That would allow me to screw along the noggins every 150mm as well so I can see it makes sense - just sounds like a lot of noggins.
Up for doing a thorough job so don't mind that many noggins - just want to make sure before going too far.
300mm spacing is BS standard...overboarding an existing substrate requires closer fixings but not direct onto joists....22mm ply would be my option and then keraquick with latex plus.....