In a new build with ufh and liquid screed throughout, I have two bathrooms to tile. First bathroom is straightforward enough and have primed and laid ditra mat. The second is to be converted to a wetroom as the buyer of the property is disabled.
Was going to build a frame on the level part of the room and build the floor up with fibre reinforced levelling compound and then form the tray to create the run.
My question, should I lay ditra before doing this work or go straight on to the heated screed and lay ditra before tiling or both. Any advice greatly appreciated.
FYI the drain is already in place.
Lewie
Was going to build a frame on the level part of the room and build the floor up with fibre reinforced levelling compound and then form the tray to create the run.
My question, should I lay ditra before doing this work or go straight on to the heated screed and lay ditra before tiling or both. Any advice greatly appreciated.
FYI the drain is already in place.
Lewie