Last week was a pain......booked to do 4 units at a barn conversion (Let's, for a B&B) nothing special, 4 showers, 4 kitchen floors/wall.
Turned up, no windows or doors on....gale blowing through. All walls covered in Hardwall plaster as the guy wants the "rustic" look.
Told him NO......

Managed to do a couple of small floor areas, but then had to pull of until shower areas are skimmed. Tried to pull next weeks job forward to start yesterday..........only to be told the plumbers haven't finished yet. So Monday it is then........then get a phone call to say shower tray is cracked, and a replacement will not be in till Monday......so that stuffs that up.

Was supposed to be laying an engineered oak floor for a relation today.......got up early, as they are an hour away. Only to get a phone call, telling me that prep war hasn't been done, as he has put his back out.

run up to Christmas is busy enough.........but I am getting well P...... Off with all these bloody hold ups, and then I'm expected to work 24/7 to get them sorted. Totally cheesed off with playing catch up.


Sorry........rant over.
 
At least your not moaning about it....:lol:

Dose make you wonder why we bother sometimes. ...chin up mate...soon be crimbo..
 
Same ere , running 2 days behind due to other trades , even today , travelled 40 odd miles to South shields to be met by plumber who is installing 2 towel rads in the bathroom I'm tiling , so most of the floor up running pipes in ahhhh :incazzato:, so no floor tilted today . Never mind eh , a good tiler will get over that I'm told.
 
The last 3 jobs have all had the same sort of problems, plumbers popping in for a couple of hours and doing nothing viable to get the job moving, a guy who wanted to do his own plumbing and surface mounting plastic pipe onto the surface of brickwork and expecting me to dry line over them.

A builder, not even going waste my time with that:mad2:
 
Must be something in the air,
I was booked in on the 10th November to start a wetroom, not ready, done the kitchen floor, 80m2 & wetroom still not ready, back on the job Wednesday there, still more work to be done before it's ready for me, then they moan that they need it done ASAP...
 
reading these replies makes me smile knowing that i'm not the only one to find myself in such a predicament
 

Advertisement

Thread Information

Title
Joys of self employment
Prefix
N/A
Forum
Australia Tiling Forum
Start date
Last reply date
Replies
10

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
CJ,
Last reply from
MTiler,
Replies
10
Views
2,506

Thread statistics

Created
CJ,
Last reply from
MTiler,
Replies
10
Views
2,506
Back