Discuss Correct substrate for longevity and waterproofing! in the The Welcome Forum area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)

Ash786

-
Reaction score
0
Hi I’m doing my own bathroom after many years of neglect, I know guilty as charged but I’m on the pursuit of a makeover that will make it good hopefully for many more years to come but I need some help in this and I’ve discovered this forum. Thank you all for having a platform that can share for a DIYER like me! 👍🏽🙏🏽

I’ve been dismantling all the tiles and have discovered the whole room has been majestically plastered with pink bonding. All the bond on the window side where the bathtub is has literally soaked into the brickwork and I have had to do away with it. The other side isn’t that bad being All of drywall material it also has gone very powdery and loose.

I was going to take this back to brick work then point the bricks. Then render and after 2 weeks of curing time use KA Slurry. Then tile over, is this method wrong or right in this situation. Can someone tell me the correct procedure as looking at the damp soaked bonding it was only a matter of time before the brickwork would be obsolete!
You’re concise help in this matter would be appreciated immensely! That’s an old photo I took all the old stuff and it just brickwork now. :oops:
 

Attachments

  • 56329122-C2E2-4A3C-8CBA-1E6EAE1A89BF.jpeg
    111.9 KB · Views: 17
D

Dumbo

Hi I’m doing my own bathroom after many years of neglect, I know guilty as charged but I’m on the pursuit of a makeover that will make it good hopefully for many more years to come but I need some help in this and I’ve discovered this forum. Thank you all for having a platform that can share for a DIYER like me! 👍🏽🙏🏽

I’ve been dismantling all the tiles and have discovered the whole room has been majestically plastered with pink bonding. All the bond on the window side where the bathtub is has literally soaked into the brickwork and I have had to do away with it. The other side isn’t that bad being All of drywall material it also has gone very powdery and loose.

I was going to take this back to brick work then point the bricks. Then render and after 2 weeks of curing time use KA Slurry. Then tile over, is this method wrong or right in this situation. Can someone tell me the correct procedure as looking at the damp soaked bonding it was only a matter of time before the brickwork would be obsolete!
You’re concise help in this matter would be appreciated immensely! That’s an old photo I took all the old stuff and it just brickwork now. :oops:
Look at fixing jackoboard or wedi board direct to brickwork but you need it to dry first .
 
D

Dumbo

No , waterproofing and build up in one go and no waiting for render to dry.
20180214_103246.jpg
 
Last edited by a moderator:

Reply to Correct substrate for longevity and waterproofing! in the The Welcome Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Please visit our sponsor websites, they keep the forum free to use!
Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,337
Messages
881,117
Members
9,529
Latest member
Finias Coroama
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks