i did a 5 day course not so long back,ido not to mention who it was with nor am i going to come on here and dum them down,but we spent DAY1 setting out a wall,bit of time on nibbling,intro to tools
a tile,DAY2all day tiing the wallDAY3 grouting the wall,intro to epoxy grout,DAY4 demo on tanking,setting out floor DAY5 AM tiing the bay floor in pairs,few training videos,PM grouted floor.
measured up 4 walls on mock bathroom as a group 8 of us thats it.
no spashbacks,tiling around a rad pipe was shown on a boardwith marker pen,no boxed in tiling,when asked about tiling around a toilet/sink was tod to get a pumber to loosen them and slide some plasterboard underneath so to tile.I see your course darren teaches this, the only thing we cut round was a socket,and light switch, i did the research ,,not good enough i know,,,,,but then it could be im not cut out for tiling,,,,,,excuse pun