Just getting to the stage before tiling in one of my bathrooms. I'm fitting tile backer boards to a full wall and half of the adjoining wall to where a 1200x800 shower will go. The walas are concrete block and have had Thistle bondit applied (the green sandy gluey paint), then a bonding coat (5-8 mm to take out some warps), and another Thistle bondit coat. Now is the bit I'm not sure about. I was going to apply a skim and then use SBR on the skim before using powder mix fast setting adhesive to fix the tile backer boards, then tile it. I'll end up with about 7 layers!.
Anyone know if I can just miss out the next plaster skim and put the tile backer boards straight on to the thistle bondit? then tile the boards?
Mal
Just getting to the stage before tiling in one of my bathrooms. I'm fitting tile backer boards to a full wall and half of the adjoining wall to where a 1200x800 shower will go. The walas are concrete block and have had Thistle bondit applied (the green sandy gluey paint), then a bonding coat (5-8 mm to take out some warps), and another Thistle bondit coat. Now is the bit I'm not sure about. I was going to apply a skim and then use SBR on the skim before using powder mix fast setting adhesive to fix the tile backer boards, then tile it. I'll end up with about 7 layers!.
Anyone know if I can just miss out the next plaster skim and put the tile backer boards straight on to the thistle bondit? then tile the boards?
Mal