F
faithhealer
Asked to quote a 40 sq mtr conservatory floor in limestone. Concrete floor, under floor heating but for starters they don't want to put a (latex) self leveller down???
They want the tiles laying in brickbond (over the 10 mtr length) which in my mind rules out an expansion joint. As I have never used Ditra or Ex. joints before I could do with your help.
Ta
They want the tiles laying in brickbond (over the 10 mtr length) which in my mind rules out an expansion joint. As I have never used Ditra or Ex. joints before I could do with your help.
Ta