Search results

  1. T

    Failed floor dot & dab

    No another contractor screed the floor, laid the underfloor heating panels and then put Cellecta screedboard on top. he also didn’t prime the screed board prior to fitting the tiles, and didn’t back butter them either, or use a notch trowel
  2. T

    Failed floor dot & dab

    Hi, I have approximately 80 m² open plan area tiled in 800 mm x 800 mm porcelain tiles. The whole installation is creaking and moving and it has become apparent that the Tiler has used a dot and dab method through out to fix the tiles. I have asked him to come and inspect the installation and...

Advertisement

Back