I need to tile a large irregular shaped room and don't see a way around taking a break. The tile is tiles laid befor ethe break plank and I am using a wedge based leveling system. What 's the collective advice for how to stop and finish sections? I.e. I amm concerned about how to make sure I get a smooth transition from the tile laid before the break to the ones I am starting after the break. I thought I would just insert the clips before the break. Will that work ?

Thanks 1
 
D

Dumbo

Some people insert clips and then dry lay a tile next to a fixed tile and put the wedge in place to hold the clip in place
 

Reply to Taking a break when using leveling system in the Canada Tile Advice area at TilersForums.com

There are similar tiling threads here

I have moved into a new house and want to tile the downstairs bathroom walls. Its not a big room...
Replies
1
Views
176
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
582
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
2
Views
566
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...