Hi, looking for help with options here. Stripped out old kitchen and lamintate floor to reveal several cracks - rubbish slab really - some small vertical movement as well as horizontal so clearly can't tile direct even with an isolation membrane. New kitchen coming in 6 weeks, can't be delayed, wife insists on tiled floor. No time to rip out and replace slab - and it would take too long to dry anyway. Looking for a less than ideal way that i might get away with. oh and limited headroom too!

Thought of levelling out and fix cracks as best I can, layer of DPM then 22mm chipboard glued as a floating floor, then tile on top using flexi adhesive? maybe with a decoupling membrane on top of chipboard? Any chance that might work? Many thanks
 
Q

Qwerty

6527855d11ab88318b5ffb6d3f048e98.jpg


2b566588c9bee7347441ea236c61d6ee.jpg


66e724af8e82652d3969f2333d8a02fd.jpg
 
N

NigelB

Thanks for all replies! Well I certainly felt like running away screaming when I saw it, already had to take the walls back to bare brick, insulate, board and skim which I finished last weekend!

I don't think I have time to replace - from what I've removed in the worst bit in the middle there is around 1.5 -2 inches of concrete on a combination of the old brick floor and earth / sand. So I would have to rip up slab, dig down at least 6 inches, pour a slab with re-bar and wait for it to dry enough for insulation and screed. I can't see it would ever by dry enough to tile ahead of kitchen fitting.

Driving force is daughters wedding, she and new family coming over from States early December hence drop dead date for fitting....divorce being the probable alternative! So starting to think best repair I can followed by engineered wood on a proper damp proof underlay may have to be the compromise.....
 

Ajax123

TF
Esteemed
Arms
931
1,213
Lincolnshire
Thanks for all replies! Well I certainly felt like running away screaming when I saw it, already had to take the walls back to bare brick, insulate, board and skim which I finished last weekend!

I don't think I have time to replace - from what I've removed in the worst bit in the middle there is around 1.5 -2 inches of concrete on a combination of the old brick floor and earth / sand. So I would have to rip up slab, dig down at least 6 inches, pour a slab with re-bar and wait for it to dry enough for insulation and screed. I can't see it would ever by dry enough to tile ahead of kitchen fitting.

Driving force is daughters wedding, she and new family coming over from States early December hence drop dead date for fitting....divorce being the probable alternative! So starting to think best repair I can followed by engineered wood on a proper damp proof underlay may have to be the compromise.....

You can cover concrete as soon as it is hard. Why do you need rebar?? Pour one day cover the next using 1200gauge polythene. Insulate and overlay it with 500gauge polythene then screed using a rapid drying screed. The whole thing could be done in a week...two at the most...
 

Reply to Low quality floor slab in the Australia Tiling Forum area at TilersForums.com

Make sure to mark a post as a solution for better transparency.

There are similar tiling threads here

  • Question
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe had worn away over the past 70 years, causing a small crack in the copper. A plumber/builder fixed...
Replies
1
Views
804
    • Like
  • Sticky
  • Question
Water Damaged Shower Repairs Shower tile repair – water damage – tile waterproofing Do you have shower leakage that goes downstairs leading to either your main floor or basement? Read this blog...
Replies
0
Views
2K
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.

Advertisement

Birthdays

Top